Reading Level: Intermediate
One of the tasks of the technician and project management. Wherever start a project, from the 'live issue' of the project until construction is completed. Here are some common problems faced engineer may:
1. Project was initiated without the approval of the engineer. And 'generally very small for the project, such as unity of the structure as a bungalow. engineer OnlyAlerts when problems happened on the ground, and the problem is not solve the problem by the contractor. Contractor, as built without disruption to the engineer.
2. Although aware of the Civil Engineering works, some of the UN-contractors responsible to strive to work in a certain time, an engineer is not present in the situation. How, for example, the concrete contractor after hours especially in the evenings, at night or on vacation.As soon as practical, is an engineer is not able to control it.
3. When construction started, one-contractors working experience with the reference to Civil Engineering, without having to read the drawings, in collaboration with other professionals such as architectural drawings, mechanical drawings and electrical systems. As a result, it is a series of hacking, during or after the completion of structural work. Created a series of arguments and costs.
4. Even if an entrepreneur is to read the inexperienceconstruction drawings, building contractor is somehow their knowledge, especially the previous project contractor. Previously, if a number of companies based on a foundation pad was built, contractors will receive a draft piling foundation. The contractor will try to change the foundation of the legs, that from his knowledge. O will also be based contractor pad foot pad Foundation small changes. It will end with a structural problem.
5. Some irresponsible contractorsEngineering instructions to ignore. Entrepreneur builds its knowledge. Contractor will have to convince more of them, that the client-contractor-builder. Client Contractor says he has more experience than city engineer. Engineer did not experience much, the creation of the site. Most of the time will agree with the employers of clients, because clients seem to entrepreneurs with physical construction works and engineering, without a lot of physical product. This will continue until the problemcase is not remedied by the contractor. Finally, they will be looking for engineering consultancy.
6. Contractor to carry out cost-cutting work on the project. Now days, the cost of the project is very competitive. To get a draft invitation to tender, some entrepreneurs at the bottom of the cost of the race at a loss. The project will be assigned, lead contractor to cut unnecessary costs. Compromising the client.
7. As a customer, contractor and client contractor, Civil Engineerare in a difficult position for the relationships with suppliers and customers. It will always be in conflict of interest.
These problems can be addressed by a civil engineer. How can they overcome in the first place based on experience of engineering. Junior engineer will not send their advice to solve these problems. In any case, be as Junior Engineer in advising senior engineer, where the problems are solved.
วันศุกร์ที่ 12 กุมภาพันธ์ พ.ศ. 2553
What are the most common problems encountered on the Project Management Work-civil and structural engineers?
ป้ายกำกับ:
common,
encountered,
engineers?,
Management,
problems,
Project,
structural,
Work-civil
สมัครสมาชิก:
ส่งความคิดเห็น (Atom)
ไม่มีความคิดเห็น:
แสดงความคิดเห็น